Title
of Activity
|
Kharkiv Municipal Energy Upgrades
|
|
Project
Implementor
|
|
Pacific
Northwest National Laboratory
Agency
for Rational Energy Use and Ecology (ARENA-ECO)
|
Address
PNNL
901
D Str., S.W., Suite 900, Washington, DC, 20024-2115 USA
Tel.
(202) 646-7865
Fax.
(202) 646-5233 (7824)
ARENA-ECO
1,
Laboratorny Str., 01133, Kyiv, Ukraine
Tel.
(38 044) 268-8088
Fax.
(38 044) 268-8451
E-mail:
arena@arena.viaduk.net
|
-
-
-
-
|
| Project
Host |
Kharkiv
Oblast State Administration
"Kharkivteploenergo"
State Committee of Ukraine for Energy Conservation
|
Address
Kharkiv Oblast State Administration
5,
Sq. Svobody, Kharkiv, 301200
Tel.
(38 0572) 43-2105
Fax:
(38 0572) 43-2201
"Kharkivteploenergo"
11,
Dobrokhotova Str., Kharkiv, 310037, Ukraine
Tel.
(38 0572) 26-2131
Fax.
(38 0572) 27-7900
State
Committee
1 ,
Gonty Str., Kyiv, 04112, Ukraine
Tel./Fax
(38 044) 455-5710
|
|
Contact
Person
Kharkiv
Oblast State Administration
Mr.
Oleg Dyomin
"Kharkivteploenergo"
Mr.
Georgiy Sergeev hte@kharkov.com
State
Committee
Mr.
Victor Merkushov
|
|
Funding
Agency
|
U.S.
Department of Energy
World
Bank
|
Address
US
Department of Energy
Headquarters
Forrestal Building 1000 Independence Avenue, SW Washington, DC 20585
World
Bank
2,
Lysenko Str., Kyiv, 01034, Ukraine
Tel.
(38 044) 490-6671/2/3
Fax.
(38 044) 490-6670
|
|
Contact
Person
US
Department of Energy
Mr.
Brian Castelli brian.castelli@hg.doe.gov
Tel.
(202) 586-9220
Fax.
(202) 586-9260
World
Bank
Mr.
Alexei Slenzak aslenzak@worldbank.org
|
|
Amount
of Funding
|
|
|
Period
of Performance
|
|
|
Types
of Activities
|
-
Installation of six stream turbines with the total capacity
84 MW
-
Replacement
of 50 km of worn-out transmission pipeline
-
Replacement
of 200 km of distribution pipeline with pre-insulated pipeline
-
Replacement
of old and low-efficient boilers with efficiency 92%
-
Installation
of 3870 individual heat substations
|
| Beneficiaries |
|
|
Summary
Description
|
DOE
has completed a preliminary feasibility study of efficiency and
turbine upgrades in the Kharkiv heating and power systems
|
|
Strategic
Objective
|
The
project will involved installation of upgraded turbine from TurboAtom,
boilers, controls, piping and insulation
|
|
Results
|
-
Arena-Eco
collected and analyzed data from "Kharkivteploenergo" and "Kharkiv
district heating networks"
- The
technical characteristics of 378 boiler houses and 458 boilers
in these boiler houses
- Technical
characteristics of main and distribution networks, that
have to be reconstructed
- Fuel
consumption data
- Heat
generation and emissions relating to these boiler houses
- Heat
load of the system
- Technical
specifications and performance of project components including
turbines and gas distribution
- Financial
state of these enterprises
-
Projects with alternative financing have been identified
-
Estimated
total investments - $173 mln
|
|
Reports
/ Docs
|
|